INVESTIGATION OF THE PARK THEATER WITH TNCPS.
9:30pm- Start investigation. Jessica and myself did a walk through in the basement, i had my digital
recorder and my sony nightshot, jessica had digital camera, EVP recorder, EMF light and EMF recorder.
10:00pm- Jessica and me went back to the theater and sat in the second to back row and began recording.
10:30pm-Jessica and I went to the front row of the theater and recorded then we went to the stage
and behind the stage and recorded.
11:00pm- Jessica and I went to the mall, walked up and down the hall recording, sat on the bench
for about fifteen munutes listning, it was very windy.
11:30pm- Jessica and I went back to the theater where apparently there was some commotion with a
banging shutter, we checked it out and found an open window.
11:40pm- Jessica and myself went to the projector room to conduct a vigil.
Midnight- End investigation.
Conclusion: Awesome place, cool pictures all over, very cold that night.